PV SYSTEM DESIGN


PV SYSTEM DESIGN

(Grid Connected System)


Maximum efficiency of PV system is 18.62%


Sizing Example-Load


Item
Quantity
Power per item (W)
Total power (W)
Time of use (h)
Total energy (Wh)
LED
5
20
100
4
400
TV
1
120
120
4
480
Computer
2
130
260
8
2080
Total


480 W

2960 Wh

Equivalent Sun Hours = 5 h/day


Solar Panel Specifications



Power output (Wp) = 240
Vmpp (V)           =     48                         
Impp (A)            =      5
Voc (V)             =     60                                                               
Isc (A)              =      6


Sizing PV Panel













Inverter Sizing


     Minimum nominal power rating = Total power from the panels × Safety margin

Minimum nominal power rating = 710.4 W × 1.2 = 852.48 W

Sizing Charge Controller


Parallel:


Maximum Current = short circuit current × number of panels
Maximum Current = 6A × 3 = 18A

Series:

Maximum Voltage = open circuit voltage × number of panels
Maximum Voltage = 60V × 3 = 180V

Charge Controller Specifications:

Maximum Current (A) = 15
Maximum Voltage (V) = 210
Operational Voltage = 12V/24V

mppt = Yes           (mppt = maximum power point tracker)

  • ·         Panel must be in series as the 15 A controller can’t handle 18A parallel PV setup


Note: For off-grid system additional components will be  as follows


Battery Sizing

Battery Specifications:

Depth of Discharge (DOD) = 60% = 0.6
Battery Voltage                   = 12V
Battery Capacity (Ah)         =100




Number of Batteries Required for the System = 5 × 2 = 10

Invertor Specifications:

Efficiency = 96% = 0.96
Operational Voltage = 12V/24V

Comments

Popular posts from this blog

Calculate Size of Capacitor Bank

Electrical Load of (1) 2 No’s of 120KW, 415V motor, 90% Efficiency, 0.8 P.F. (2) 2 No’s of 150KW, 415V motor, 90% Efficiency, 0.8 P.F. (3) 100KW, 415V Lighting Load. The targeted P.F. Of system is 0.98 Calculate Size of Discharge Resister for discharging of Capacitor Bank Discharge rate of capacitor is 55v in less than 1 minute. Also calculate reduction in KVAR Rating of capacitor if Capacitor bank is operated at frequency of 30Hz instead of 50Hz and if operating voltage is 390V instead of 415V Calculation:  For Connection (1): Total Load KW for Connection (1) =KW / Efficiency=(120×2) / 0.9=266.67KW  Total Load KVAR1= KW×([(√1-(Old P.F.)^2) / Old P.F.] - [(√1-(New P.F.)^2 / New P.F])   Total Load KVAR1=266.67×([(√1-(0.8)^2) / 0.8] - [(√1-(0.98)^2) / 0.98])    Total Load KVAR1=145.98 KVAR  OR  Total Load KVAR1= KW×(tanϕ1- tanϕ2) =266.67×(tan 36.87 - tan 11.48)              ...

High Speed Rails and How they Work?

Railway is one of the most ancient form of long distance transportation. Many developments has been made to railway throughout the time. Wooden trains were the oldest and they're the first kind of trains which was used to pushed by animals and humans. Speed is always a concern for railway they always want to achieve higher speeds. To achieve high speed the High Speed Rails (HSR) has been developed. First High Speed Rail The first Electric HSR was introduced by Japan on 1 October 1964, Japanese national railways started the operation of a fully brand new 515 km standard gauge line, the Tokaido Shinkansen , from Tokyo Central to Shin Osaka. Tokaido Shinkansen had the Top Speed of 210km/hr. Development  After Japans Tokaido Shinkansen success, many other countries adopted HSR system. Now, only 16 nations have HSR system. China has done a lot to their transport system in last 15 years. China began planning for its current high-speed rail system in the early 1990s, mo...

Sizing Of Diesel Generator

Sizing Of Diesel Generator Size a diesel generator for following electrical load. Future  load expansion is 20%. Average use of equipment is 0.8. 1) 5 No. of 1 Ph, 230 V, 100 W, CFL bulb, diversity factor is 0.8, starting and running pf is 0.9. 2) 3 No. of 1 Ph, 230 V, 2500 W, Air conditioner with diversity factor of 1, starting and running PF is       0.9. 3) 4 No. of 1 Ph, 230 V, 600 W, halogen lights. Diversity factor is 0.8, starting and running PF is 0.9 4) 2 No. of 3 Ph, 430 V, 15 KW motor with Y-D starter having diversity factor of 0.8, starting P.F is        0.8 and running P.F is 0.9. 5) 2 No. of 3 Ph, 430 V, 100 KW, motor with soft starter having diversity factor of 0.8, starting P.F is      0.8 and running P.F is 0.9 Starting Current of linear and non-linear loads Type Of Load Equipment Starting Current Linear Load General 100% of full lo...