Electrical Load of (1) 2 No’s of 120KW, 415V motor, 90% Efficiency, 0.8 P.F. (2) 2 No’s of 150KW, 415V motor, 90% Efficiency, 0.8 P.F. (3) 100KW, 415V Lighting Load. The targeted P.F. Of system is 0.98 Calculate Size of Discharge Resister for discharging of Capacitor Bank Discharge rate of capacitor is 55v in less than 1 minute. Also calculate reduction in KVAR Rating of capacitor if Capacitor bank is operated at frequency of 30Hz instead of 50Hz and if operating voltage is 390V instead of 415V Calculation: For Connection (1): Total Load KW for Connection (1) =KW / Efficiency=(120×2) / 0.9=266.67KW Total Load KVAR1= KW×([(√1-(Old P.F.)^2) / Old P.F.] - [(√1-(New P.F.)^2 / New P.F]) Total Load KVAR1=266.67×([(√1-(0.8)^2) / 0.8] - [(√1-(0.98)^2) / 0.98]) Total Load KVAR1=145.98 KVAR OR Total Load KVAR1= KW×(tanϕ1- tanϕ2) =266.67×(tan 36.87 - tan 11.48) = 266.67×(0.75 - 0.203)
Sizing Of Diesel Generator Size a diesel generator for following electrical load. Future load expansion is 20%. Average use of equipment is 0.8. 1) 5 No. of 1 Ph, 230 V, 100 W, CFL bulb, diversity factor is 0.8, starting and running pf is 0.9. 2) 3 No. of 1 Ph, 230 V, 2500 W, Air conditioner with diversity factor of 1, starting and running PF is 0.9. 3) 4 No. of 1 Ph, 230 V, 600 W, halogen lights. Diversity factor is 0.8, starting and running PF is 0.9 4) 2 No. of 3 Ph, 430 V, 15 KW motor with Y-D starter having diversity factor of 0.8, starting P.F is 0.8 and running P.F is 0.9. 5) 2 No. of 3 Ph, 430 V, 100 KW, motor with soft starter having diversity factor of 0.8, starting P.F is 0.8 and running P.F is 0.9 Starting Current of linear and non-linear loads Type Of Load Equipment Starting Current Linear Load General 100% of full load current Non-linear load UPS, Inverter,